Eight services. One crew standing behind all of them.

Everything below is done by Rooftick employees. Nothing on this page is passed to a subcontractor once you have signed.

(What we do)

One cracked boot to twenty-two thousand square feet

Roof Replacement

A full tear-off and rebuild. Rotted sheathing replaced, ice barrier at the eaves, new flashing at every penetration, and a deck you have photographs of.

  • Full tear-off
  • Deck repair
  • Ice barrier
  • Ventilation
  • 25-year warranty
Explore Service

Roof Repair

A targeted fix with a written diagnosis. Failed flashing rebuilt, lifted shingles reset, wet decking checked before anything is closed back up.

  • Leak tracing
  • Shingles
  • Flashing
  • Pipe boots
  • Same-week visits
Explore Service

Storm & Hail Damage

Emergency tarping first, documentation second. Test squares marked out, dated photo report built for your adjuster, then a full rebuild once the claim clears.

  • Hail
  • Wind
  • Emergency tarping
  • Insurance photos
  • Adjuster meetings
Explore Service

Roof Inspection

A full survey of field, flashing, penetrations and attic. Photo report with a remaining-life estimate and a prioritised list — act now, watch, or leave alone.

  • Photo report
  • Attic check
  • Moisture scan
  • Written findings
Explore Service

Metal Roofing

Standing seam or exposed fastener, rolled and cut on site. Concealed clips that let the panel move, and a roof measured in decades rather than years.

  • Standing seam
  • Exposed fastener
  • Snow guards
  • Energy savings
Explore Service

Flat & Low-Slope Roofing

Fully adhered single-ply membrane with heat-welded seams. Tapered insulation to build fall where the deck has none, and every penetration properly flashed.

  • TPO
  • EPDM
  • Tapered insulation
  • Flood testing
Explore Service

Gutters & Drainage

Seamless aluminium run on site to the exact length of each fascia. Hidden hangers every two feet, correct fall to the outlets, and downpipes that discharge away from the foundation.

  • Seamless gutters
  • Downspouts
  • Gutter guards
  • Fascia repair
Explore Service

Skylights & Roof Windows

Deck-mounted units set on a proper curb with a manufacturer flashing kit. Cut, framed, flashed and made watertight the same day it is opened.

  • New skylights
  • Flashing kits
  • Curb rebuilds
  • Same-day install
Explore Service
(What we do)

Occupied buildings are a different job

Engineer with safety glasses checking solar panels using a level and blueprint outdoors at sunset.

A third of our work happens over people who are still living or trading underneath it. That changes the sequence, the hours and the risk, and it is not something a residential crew can improvise.

4
8
7
6
5
5
5
4
3
2
2
8
7
6
5
4
3
2
2
2
0
8
8
8
7
6
5
4
3
2
0
8
8
8
7
6
5
4
3
0
Roofs Completed
2
8
7
6
5
5
5
4
3
2
2
8
7
6
5
4
3
2
2
4
0
8
8
8
7
6
5
4
3
2
Claims Approved In Full
Technician wearing hard hat checks solar panel alignment with a level tool outdoors.
(How a job runs)

The same four steps, every service

Bearded construction worker in a yellow hard hat and vest using a cordless drill on a metal roof.
Step 01
01
On the roof, not on the phone

An estimator climbs it, photographs twenty-one points and writes down what is actually there.

Step 02
02
Line-by-line estimate

Material, labour, tear-off, disposal and the decking all stated before you sign.

Step 03
03
Scheduled around you

A confirmed start date, a confirmed crew, and a phone call the evening before — not a truck that turns up unannounced at six in the morning.

Step 04
04
Handover and warranty

A full photo record, both warranties registered, and a property left cleaner than the crew found it.

(Asked Questions)

Frequently Asked Questions

Need More Information? Contact Us Below

Most homes are dried in on day one and finished within three. Weather is the only real variable, and we will not open a roof we cannot close again the same day.

If the damage is storm or hail related, usually yes. We document the roof the way an adjuster needs to see it, file alongside you, and meet the adjuster on the roof so nothing gets quietly trimmed from the scope.

Every estimate states a decking allowance up front, so rotten sheathing is priced before we start rather than discovered afterwards. We photograph every board we replace and only charge for what is actually swapped.

Yes. Twelve months interest-free for deductibles and smaller repairs, or terms up to twelve years for full replacements. Approved storm claims usually mean you pay the deductible only and we invoice your insurer directly.

Two warranties, both registered before we leave. The manufacturer covers the materials, and our own workmanship warranty covers the installation itself — including flashing, penetrations and the ventilation work.

About a third of our work is commercial or multi-family, most of it over occupied buildings. Flat and low-slope membrane, standing-seam metal, phased scheduling and night work where tenants cannot be disturbed.

(Free estimate)

Let’s get up there and have a look

Free inspection, a photographed report, and a fixed quote inside twenty-four hours. No pressure, no call-backs from a sales team.