Gutters & Drainage

Seamless aluminium run on site to the exact length of each fascia. Hidden hangers every two feet, correct fall to the outlets, and downpipes that discharge away from the foundation.

Modern house roof with dark tiles and gutters

The cheapest part of the roof, and the one that ruins foundations

A gutter has one job: catch what the roof sheds and carry it away from the building. When it fails, the water does not simply spill — it runs down the fascia, soaks the soffit, freezes at the eaves in winter and settles into the ground exactly where you least want it. Most of the basement damp we get called about started as a blocked outlet six metres in the air.

We run seamless aluminium, formed on site to the exact length of each fascia, so the only joints in the entire system are at corners and outlets. Hidden hangers go in every two feet rather than every three, because sagging is what breaks fall, and fall is the whole point.

Roofers working on a roof

What you actually receive

  • Seamless runs formed on site — joints only at corners and outlets
  • Hidden hangers at two-foot centres, screwed into the fascia board rather than nailed
  • Fall set and water-tested with a hose before the crew packs up
  • Downpipes discharging clear of the foundation, with extensions where the ground runs the wrong way

Roofer fixing roof panels

Where the price actually moves

Linear footage sets the floor and almost nothing else. Height decides the equipment. Profile and gauge decide how the system handles a genuine downpour — six-inch on a large or steep roof is not an upsell, it is arithmetic. Rotted fascia found behind the old gutter is the common surprise, and guards are worth it under trees and largely wasted everywhere else. We will tell you which situation you are in.

We test every run with a hose before we leave. A gutter that looks level and drains backwards is worse than no gutter at all.

(Related Services)

Related services

Roofer in a harness laying new roof tiles
Roofer fixing tiles with a power drill
Two roofers repairing a damaged tiled roof
Roofer checking a tablet while inspecting a roof

Roof Replacement

A full tear-off and rebuild. Rotted sheathing replaced, ice barrier at the eaves, new flashing at every penetration, and a deck you have photographs of.

Roof Repair

A targeted fix with a written diagnosis. Failed flashing rebuilt, lifted shingles reset, wet decking checked before anything is closed back up.

Storm & Hail Damage

Emergency tarping first, documentation second. Test squares marked out, dated photo report built for your adjuster, then a full rebuild once the claim clears.

Roof Inspection

A full survey of field, flashing, penetrations and attic. Photo report with a remaining-life estimate and a prioritised list — act now, watch, or leave alone.

(Asked Questions)

Frequently Asked Questions

Need More Information? Contact Us Below

Most homes are dried in on day one and finished within three. Weather is the only real variable, and we will not open a roof we cannot close again the same day.

If the damage is storm or hail related, usually yes. We document the roof the way an adjuster needs to see it, file alongside you, and meet the adjuster on the roof so nothing gets quietly trimmed from the scope.

Every estimate states a decking allowance up front, so rotten sheathing is priced before we start rather than discovered afterwards. We photograph every board we replace and only charge for what is actually swapped.

Yes. Twelve months interest-free for deductibles and smaller repairs, or terms up to twelve years for full replacements. Approved storm claims usually mean you pay the deductible only and we invoice your insurer directly.

Two warranties, both registered before we leave. The manufacturer covers the materials, and our own workmanship warranty covers the installation itself — including flashing, penetrations and the ventilation work.

About a third of our work is commercial or multi-family, most of it over occupied buildings. Flat and low-slope membrane, standing-seam metal, phased scheduling and night work where tenants cannot be disturbed.

(Free estimate)

Let’s get up there and have a look

Free inspection, a photographed report, and a fixed quote inside twenty-four hours. No pressure, no call-backs from a sales team.